The rebirth of the lounge fireplace
03oct2009
23sep2009
28aug2009
19aug2009
10aug2009
08aug2009
05aug2009
22jul2009
11jul2009
22jun2009
21jun2009
12jun2009
11jun2009
05jun2009
12may2009
29apr2009
04apr2009
26mar2009
18mar2009
10mar2009
19feb2009
10feb2009
22jan2009
Joist repairs
Covering up with vapour barrier, then sheeting with plasterboard....
The first sheet  
The landing ceiling  
The end bedroom ceiling  
From the other side  
Landing from the other end  
The ceiling above the stairs  
The lounge ceiling is up  
The stairs from below...  
...and from above  
Vapour barrier on the landing  
The landing  
Lining the alcove in the bedroom  
Timber lining fitted  
The other alcove  
The bedroom is nearly finished