 31 May 2010 - Completion of a couple of sections of wall...
 
November2011
October2011
15jul2011
26may2011
19may2011
19apr2011
07mar2011
22feb2011
16feb2011
10feb2011
20jan2011
22dec2010
30nov2010
17nov2010
15nov2010
31oct2010
16oct2010
28sep2010
16sep2010
14sep2010
13sep2010
08sep2010
03sep2010
30aug2010
24aug2010
19aug2010
jul2010
jun2010
31may2010
18may2010
30apr2010
26apr2010
12mar2010
Xmas 2009
17dec2009
The rebirth of the lounge fireplace
03oct2009
23sep2009
28aug2009
19aug2009
10aug2009
08aug2009
05aug2009
22jul2009
11jul2009
22jun2009
21jun2009
12jun2009
11jun2009
05jun2009
12may2009
29apr2009
04apr2009
26mar2009
18mar2009
10mar2009
19feb2009
10feb2009
22jan2009
Joist repairs
The front and side walls of the terrace are completed....
The junction of the terrace side wall and the original wall in front of the cottage.  
Another view of the corner.  
The rear of the steps has been infilled with rubble.  
Another view of the steps.  
Steps from the side.  
View from the front. The top of the wall will be ground level for the terrace.  
Closer view of the front and the steps.  
View from the bottom of the garden.  
The terrace side wall.  
Closer view showing the wall coping.  
It's all in the detail...