| The screed was poured on the 17th November. It's now safe to walk on, but won't be fully dry until sometime in February. |
 |
A sea of glistening white. |
|
 |
As temperatures outside plummet, the lounge stove is on every day. The rudimentary
hearth is to prevent any direct heating of the screed in front of the stove. |
|
 |
The study floor. |
|
 |
The shower room. The screed has a thin layer of scum on top which will eventually flake off. |
|
 |
Kitchen first fix electrics going in. |
|
 |
The duvet at the window is to protect the water main: the big freeze has set in outside. |
|
 |
The bottom step is now so much nearer the floor. |
|