| As it got colder outside, work continued inside.... |
 |
The new door in the lounge has it's timber surround added. |
|
 |
The fireplace wall in the lounge is now finished. |
|
 |
The middle bedroom upstairs with it's new fireplace. |
|
 |
The main bedroom upstairs is now fully timber framed out. |
|
 |
The cupboard on the landing with the new internal soil stack. |
|
 |
The downstairs shower-room ceiling showing the drainage for the new upstairs bathroom. |
|